Civil engineering and land surveying services for Phases 3 and 4 of the City of Victor, Community Development Block Grants. Improvements included stormwater management, minor grading, new curb/gutter/sidewalk with ADA-compliant accessibility, lighting, and Internet conduit.

Civil engineer support for Phase I of the new African Rift exhibit at the Cheyenne Mountain Zoo in Colorado Springs. Grading, stormwater, and utility systems design completed to be compatible with three new buildings and other exhibit features.

Baseline personnel completed Phase I and Phase II Environmental Site Assessments (ESAs) at the former American Medical Response (AMR) facility located in Denver, Colorado.

Baseline personnel reviewed available environmental documents to determine if the soil and groundwater were potentially impacted by former operations and made recommendation on what the property would require if development were to occur.

Baseline personnel were retained to contract with a general abatement contractor and supervise the remediation of asbestos-impacted materials at the property and surrounding area, and complete demolition of the structure, the former Rockies Inn, a 50,000-sf, four- story building.

The Snow Bowl project involved a full interior renovation of the existing bowling alley, addition to the building, and outside lawn and music stage.

Baseline designed a new roundabout at the intersection of Mt. Werner Road and Steamboat Blvd. which is a route to and from the Steamboat Ski Resort. The project goal included increased safety and traffic flow through the intersection.

The KOA Island Development project included the construction of asphalt roadways, construction of RV pad sites, tent sites, along with grading and drainage improvements.

This commercial project includes two new warehouse buildings on the south half of Lot 7 in the Elk River Business Park along with associated parking lot paving, drainage improvements, and utility service lines.

A 2019 Engineering News-Record merit award-winning project, Baseline design a 120-ft-diameter
roundabout at Ski Time Square and Mt. Werner Circle in Steamboat Springs, CO.

Meridian Trust Federal Credit Union created a demonstration garden at their Wellington, Colorado branch that is open to the general public, school groups, and community members to walk through the gardens and enjoy the space.

This $23.7M CDOT project is a Tier 3, 410 days for public information management services.

For over five years, Baseline prepared road rehabilitation plans for over 35 miles of Weld County paved roads.

This $14.14M CDOT project is a Tier 3, 433 days for public information management services.

Baseline was retained by Christian Brothers Automotive to support the surveying, design, and permitting of new franchise locations throughout Colorado.

This $11.7M CDOT project is a Tier 3, 275 days for public information management services.

The Ulysses Street Camping World, located in Golden, Colorado, is a 18,500 square foot warehouse for RV operation services.

Breeze Thru Headquarters, includes a mixed-use building that has affordable housing on the upper story and office and conference spaces on the lower portions of the building.

Baseline provides pre-planning, due diligence, conceptual land use planning, site layout, and rezoning assistance to Cardel Homes for a 100-acre parcel. Baseline also provides entitlement assistance related to the Lakewood development review process/Rooney Valley development process. Entitlement assistance Rezoning Public meetings Conceptual land use planning Subdivision plat

10th Street Greeley RV Park Campground is a planned, 54-unit, 3.72-acre, RV park designed to give visitors another option for lodging in Greeley.

Inspired by the history and existing Town theme of “Garden Spot of Colorado,” the Town of Berthoud revitalization project incorporates landscape architecture, civil engineering, and design and monumentation.

Emerson Flats, located in the Capitol Hill area at 1358 Emerson Street in Denver, is a multi-family apartment complex completed in 2020. Baseline provided: Site grading Stormwater detention Sanitary and storm improvements Roadway improvements, including sidewalks and curb/gutters Construction inspection

Baseline is currently completing the boundary surveying, routing, certified easement exhibits, construction plans, construction staking and as-builts for over 40 miles of gas pipeline infrastructure.

Baseline prepared multiple monumented land surveys and ALTA/ACSM surveys throughout Colorado for several car dealerships. ALTA/ACSM surveys Subdivision plans Design surveys

Julian32 at Highlands Square is an updated high-rise apartment building located in the popular, historic Old Highlands Square in Denver at 3405 W. 32nd Avenue. Baseline provided: Site survey Civil site plan for the main and Moncrieff parking lots Civil engineering design for drainage improvements for the main lot and improvements along the Julian frontage

Baseline provided ongoing infrastructure rehabilitation support of the 9th Avenue and 27th Street project, including ROW mapping, topographic surveying, and utility mapping.

Baseline performs on-call surveying for permitting at several northern Colorado locations.

Baseline completed the ballfield construction staking, 6th Avenue design surveying, and construction staking, and the small arms building construction staking.

Baseline was retained to remedy Mill Creek’s copper corrosion issue and design a new water treatment plant.

Baseline completed a wastewater master plan and designed a new wastewater treatment plant for the town.

Baseline is the designer for this design-build water treatment plant capital improvements project for the City’s two treatment plants.

Baseline provided engineering services to design a water distribution master plan through a two-phased project approach.

Baseline provided design for a new roadway, firefighting improvements, grading, drainage, and utilities for a new dormitory and student union buildings on a rural school campus.

Baseline was part of the design team for a new pole barn office and storage building at the Rocky Mountain Youth Corps campus in Steamboat Springs.

The Brent Romick Rodeo Arena is home to the Steamboat Springs Pro Rodeo Series.

In an effort to reduce the impact of its activity on a nearby community, Crestone Peak Resources hired Baseline to assist in permitting and site grading and drainage design for this centralized gathering facility.

McDonald Automotive has several dealership locations throughout the Front Range, including: Audi Denver, McDonald Hyundai, McDonald Mazda, McDonald Volkswagen, and McDonald Volvo.

Phase 1 of the 4.5-acre project site included a 3,200-sf building with access drive improvements, surface parking stalls, a drop-off turnaround near the front entry, and a second turnaround access on the east side of the building.

For our oil and gas clients, Baseline completes wellhead certifications and exhibits. These products are submitted to the Colorado Oil and Gas Conservation Commission to support permitting of new oil and gas wells.

Baseline is a longstanding partner with Jefferson County and has completed several projects under its on-call contract with Jefferson County Open Space, including the Pine Valley Ranch Water Diversion project.

Baseline assisted Camping World with rezoning a parcel of land located within Jefferson County.

Baseline assisted with full zoning approval and site development services for a 25-acre property located in unincorporated Jefferson County.

Baseline provided design and construction management for a fiber optic build project that spanned the city limits with new trunk and lateral fiber optic lines.

Baseline provided surveying and engineering design for traffic control at the 6th Avenue gate to Buckley Air Force Base.

Baseline performed work in every key phase, including conceptual design development and construction document design for this primary commercial corridor project.

Baseline manages the City of Black Hawk’s planning, development review, urban design review, and guideline applications.