Project Category: Public Agencies/Municipal

Community Development Block Grants Phases 3 & 4

Civil engineering and land surveying services for Phases 3 and 4 of the City of Victor, Community Development Block Grants. Improvements included stormwater management, minor grading, new curb/gutter/sidewalk with ADA-compliant accessibility, lighting, and Internet conduit.

Mt. Werner & Steamboat Blvd. Roundabout

Baseline designed a new roundabout at the intersection of Mt. Werner Road and Steamboat Blvd. which is a route to and from the Steamboat Ski Resort. The project goal included increased safety and traffic flow through the intersection.

Berthoud Roundabout & Medians

Inspired by the history and existing Town theme of “Garden Spot of Colorado,” the Town of Berthoud revitalization project incorporates landscape architecture, civil engineering, and design and monumentation.

Ski Time Square/Mt. Werner Circle Roundabout

A 2019 Engineering News-Record merit award-winning project, Baseline design a 120-ft-diameter
roundabout at Ski Time Square and Mt. Werner Circle in Steamboat Springs, CO.

Rocky Mountain Youth Corps

Baseline was part of the design team for a new pole barn office and storage building at the Rocky Mountain Youth Corps campus in Steamboat Springs.

9th Avenue Design Survey

Baseline provided ongoing infrastructure rehabilitation support of the 9th Avenue and 27th Street project, including ROW mapping, topographic surveying, and utility mapping.

Buckley Air Force Base

Buckley Air Force Base, Aurora, CO

Baseline provided surveying and engineering design for traffic control at the 6th Avenue gate to Buckley Air Force Base.

Steamboat Mountain School

Baseline provided design for a new roadway, firefighting improvements, grading, drainage, and utilities for a new dormitory and student union buildings on a rural school campus.

Central Park Drive Reconstruction

Baseline performed work in every key phase, including conceptual design development and construction document design for this primary commercial corridor project.

Haul Road Projects

For over five years, Baseline prepared road rehabilitation plans for over 35 miles of Weld County paved roads.