Baseline is currently completing the boundary surveying, routing, certified easement exhibits, construction plans, construction staking and as-builts for over 40 miles of gas pipeline infrastructure.

Baseline prepared multiple monumented land surveys and ALTA/ACSM surveys throughout Colorado for several car dealerships. ALTA/ACSM surveys Subdivision plans Design surveys

For over five years, Baseline prepared road rehabilitation plans for over 35 miles of Weld County paved roads.

Baseline provided ongoing infrastructure rehabilitation support of the 9th Avenue and 27th Street project, including ROW mapping, topographic surveying, and utility mapping.

Baseline performs on-call surveying for permitting at several northern Colorado locations.

Baseline completed the ballfield construction staking, 6th Avenue design surveying, and construction staking, and the small arms building construction staking.

Baseline is assisting Yeti Cycles with rezoning a 40-acre property in Jefferson County to be used as an outdoor recreation campus for its headquarters.

Baseline provides pre-planning, due diligence, conceptual land use planning, site layout, and rezoning assistance to Cardel Homes for a 100-acre parcel. Baseline also provides entitlement assistance related to the Lakewood development review process/Rooney Valley development process. Entitlement assistance Rezoning Public meetings Conceptual land use planning Subdivision plat

Baseline is the designer for this construction management-at-risk water treatment plant upgrade that includes treatment capacity expansion from 1.8 mgd to 3.5 mgd.

Baseline was retained to remedy Mill Creek’s copper corrosion issue and design a new water treatment plant.

Baseline completed a wastewater master plan and designed a new wastewater treatment plant for the town.

Baseline is the designer for this design-build water treatment plant capital improvements project for the City’s two treatment plants.

Baseline provided engineering services to design a water distribution master plan through a two-phased project approach.

Baseline provided design for a new roadway, firefighting improvements, grading, drainage, and utilities for a new dormitory and student union buildings on a rural school campus.

Baseline was part of the design team for a new pole barn office and storage building at the Rocky Mountain Youth Corps campus in Steamboat Springs.

The Brent Romick Rodeo Arena is home to the Steamboat Springs Pro Rodeo Series.

In an effort to reduce the impact of its activity on a nearby community, Crestone Peak Resources hired Baseline to assist in permitting and site grading and drainage design for this centralized gathering facility.

Baseline was retained by Christian Brothers Automotive to support the surveying, design, and permitting of new franchise locations throughout Colorado.

McDonald Automotive has several dealership locations throughout the Front Range, including: Audi Denver, McDonald Hyundai, McDonald Mazda, McDonald Volkswagen, and McDonald Volvo.

Phase 1 of the 4.5-acre project site included a 3,200-sf building with access drive improvements, surface parking stalls, a drop-off turnaround near the front entry, and a second turnaround access on the east side of the building.

For our oil and gas clients, Baseline completes wellhead certifications and exhibits. These products are submitted to the Colorado Oil and Gas Conservation Commission to support permitting of new oil and gas wells.

Baseline is a longstanding partner with Jefferson County and has completed several projects under its on-call contract with Jefferson County Open Space, including the Pine Valley Ranch Water Diversion project.

Baseline assisted Camping World with rezoning a parcel of land located within Jefferson County.

Baseline assisted with full zoning approval and site development services for a 25-acre property located in unincorporated Jefferson County.

Baseline provided design and construction management for a fiber optic build project that spanned the city limits with new trunk and lateral fiber optic lines.

Baseline provided surveying and engineering design for traffic control at the 6th Avenue gate to Buckley Air Force Base.

Baseline performed work in every key phase, including conceptual design development and construction document design for this primary commercial corridor project.

Baseline manages the City of Black Hawk’s planning, development review, urban design review, and guideline applications.