The Snow Bowl project involved a full interior renovation of the existing bowling alley, addition to the building, and outside lawn and music stage.
The Snow Bowl project involved a full interior renovation of the existing bowling alley, addition to the building, and outside lawn and music stage.
Baseline designed a new roundabout at the intersection of Mt. Werner Road and Steamboat Blvd. which is a route to and from the Steamboat Ski Resort. The project goal included increased safety and traffic flow through the intersection.
The KOA Island Development project included the construction of asphalt roadways, construction of RV pad sites, tent sites, along with grading and drainage improvements.
This commercial project includes two new warehouse buildings on the south half of Lot 7 in the Elk River Business Park along with associated parking lot paving, drainage improvements, and utility service lines.
10th Street Greeley RV Park Campground is a planned, 54-unit, 3.72-acre, RV park designed to give visitors another option for lodging in Greeley.
Breeze Thru Headquarters, includes a mixed-use building that has affordable housing on the upper story and office and conference spaces on the lower portions of the building.
The Ulysses Street Camping World, located in Golden, Colorado, is a 18,500 square foot warehouse for RV operation services.
This $23.7M CDOT project is a Tier 3, 410 days for public information management services.
This $14.14M CDOT project is a Tier 3, 433 days for public information management services.
This $11.7M CDOT project is a Tier 3, 275 days for public information management services.
Meridian Trust Federal Credit Union created a demonstration garden at their Wellington, Colorado branch that is open to the general public, school groups, and community members to walk through the gardens and enjoy the space.
Inspired by the history and existing Town theme of “Garden Spot of Colorado,” the Town of Berthoud revitalization project incorporates landscape architecture, civil engineering, and design and monumentation.
Julian32 at Highlands Square is an updated high-rise apartment building located in the popular, historic Old Highlands Square in Denver at 3405 W. 32nd Avenue. Baseline provided: Site survey Civil site plan for the main and Moncrieff parking lots Civil engineering design for drainage improvements for the main lot and improvements along the Julian frontage
Emerson Flats, located in the Capitol Hill area at 1358 Emerson Street in Denver, is a multi-family apartment complex completed in 2020. Baseline provided: Site grading Stormwater detention Sanitary and storm improvements Roadway improvements, including sidewalks and curb/gutters Construction inspection
A 2019 Engineering News-Record merit award-winning project, Baseline design a 120-ft-diameter
roundabout at Ski Time Square and Mt. Werner Circle in Steamboat Springs, CO.
Baseline prepared multiple monumented land surveys and ALTA/ACSM surveys throughout Colorado for several car dealerships. ALTA/ACSM surveys Subdivision plans Design surveys
Baseline completed the ballfield construction staking, 6th Avenue design surveying, and construction staking, and the small arms building construction staking.
Baseline provides pre-planning, due diligence, conceptual land use planning, site layout, and rezoning assistance to Cardel Homes for a 100-acre parcel. Baseline also provides entitlement assistance related to the Lakewood development review process/Rooney Valley development process. Entitlement assistance Rezoning Public meetings Conceptual land use planning Subdivision plat
Baseline is the designer for this construction management-at-risk water treatment plant upgrade that includes treatment capacity expansion from 1.8 mgd to 3.5 mgd.
Baseline is the designer for this design-build water treatment plant capital improvements project for the City’s two treatment plants.