Baseline provided design for a new roadway, firefighting improvements, grading, drainage, and utilities for a new dormitory and student union buildings on a rural school campus.
Project Category: Civil Engineering
Central Park Drive Reconstruction
Baseline performed work in every key phase, including conceptual design development and construction document design for this primary commercial corridor project.
Pine Valley Ranch Park Water Diversion Engineering
Baseline is a longstanding partner with Jefferson County and has completed several projects under its on-call contract with Jefferson County Open Space, including the Pine Valley Ranch Water Diversion project.
Haul Road Projects
For over five years, Baseline prepared road rehabilitation plans for over 35 miles of Weld County paved roads.
Fiber Optic Build for Expanded Broadband
Baseline provided design and construction management for a fiber optic build project that spanned the city limits with new trunk and lateral fiber optic lines.
Delivery, Storage, and Distribution System Master Plan
Baseline provided engineering services to design a water distribution master plan through a two-phased project approach.
Mill Creek Park Microfiltration Treatment Plant Design
Baseline was retained to remedy Mill Creek’s copper corrosion issue and design a new water treatment plant.
Red Cliff Advanced RBC WWTP Design
Baseline completed a wastewater master plan and designed a new wastewater treatment plant for the town.